Project case study
Dubai Villa Roof Waterproofing & Cool Roof Coating
A completed villa roof project at HE Villa C2 in Dubai. CoolRoof UAE was the client-facing principal contractor for the waterproofing, cool-roof coating and handover route.
Project facts
- Project type
- Villa roof waterproofing and reflective cool-roof coating
- Location / emirate
- HE Villa C2, Dubai, UAE
- Roof area (m²)
- Approx. 105 m2 coating and detailing area (main roof approx. 98 m2)
- Roof type
- Villa flat roof (concrete deck) with AC units, a solar water heater, parapets and pipe penetrations
- System used
- Sikalastic-525 RoofPro GCC White with local waterproofing and reinforcing-detail treatment around weak roof zones, drains, edges and penetrations.
- Duration
- Site execution and practical handover documented in June 2026.
- Warranty route
- 24-month workmanship and waterproofing support warranty from CoolRoof's written practical acceptance, subject to the agreed scope and standard exclusions.
Client problem
A villa roof exposed to Dubai heat with roof-service, edge, drain, parapet and pipe-penetration details requiring waterproofing treatment alongside a reflective roof finish.
Materials
- 10 pails of Sikalastic-525 RoofPro GCC White supplied to the project.
- CoolRoof-approved repair and detailing materials, reinforcing fabric/tape and detail accessories at instructed weak zones.
- Pipe insulation and drain-outlet materials where instructed on site.
Preparation
- Protection of adjacent villa areas, AC and service items before roof works.
- Removal of loose roof layers, damaged protection material, old insulation and small construction debris from instructed zones.
- Sweeping, washing, cleaning and drying of roof fields, drains, pipe areas, upstands and detail zones.
- Local preparation of weak joints, cracks, penetrations, pipe bases, drains, edges and transitions.
Application steps
- Install CoolRoof-approved reinforcing fabric, tape and detail accessories at instructed weak zones.
- Apply repair and waterproofing detail materials at cracks, joints, penetrations, pipe bases, drains and transitions.
- Apply the reflective roof-coating system and additional local coats at high-risk details where required.
- Protect fresh material during drying, complete final cleaning and document practical handover.
Project gallery
Selected real project images, chosen to show the completed roof clearly.
After



Get a similar assessment
Tell us your roof type, approximate area and location and we will confirm the right coating, waterproofing or combined route before a site visit.
WhatsApp for a free specialist visit